Home

Fleet

Monsoon Enabler

Length overall:

87.5 m

Accomodation.

120 POB

Breadth moulded:

19.8 m

Depth main deck:

7.4 m

Ship designer:

Vard Design

Hull Yard:

Vard Vung Tau

Ship type:

CSOV

Sector:

Energy

Delivered:

August 2025

Integrated bridge system

The vessel's bridge is built around Vard's SeaQ integrated bridge system, providing an intuitive platform for navigation and vessel management. Designed with the operator in focus, the system supports safe and efficient operations around offshore wind installations.

Precision lift operations

For lifting and cargo handling, Monsoon Enabler carries an IMECA Cygnus 6T 3D crane. With active motion compensation across three axes, the crane delivers precise load control in dynamic offshore conditions — supporting both construction and maintenance operations at the windfield.

Seamless access to offshore structures

Monsoon Enabler is equipped with an SMST gangway, a motion-compensated personnel transfer system designed for reliable and safe access to offshore wind installations. The gangway ensures efficient crew transfers across a wide range of sea states, keeping operations on schedule.