Length overall:
87.5 m
Accomodation.
120 POB
Breadth moulded:
19.8 m
Depth main deck:
7.4 m

Ship designer:
Vard Design
Hull Yard:
Vard Vung Tau
Ship type:
CSOV
Sector:
Energy
Delivered:
August 2025
The vessel's bridge is built around Vard's SeaQ integrated bridge system, providing an intuitive platform for navigation and vessel management. Designed with the operator in focus, the system supports safe and efficient operations around offshore wind installations.

For lifting and cargo handling, Monsoon Enabler carries an IMECA Cygnus 6T 3D crane. With active motion compensation across three axes, the crane delivers precise load control in dynamic offshore conditions — supporting both construction and maintenance operations at the windfield.

Monsoon Enabler is equipped with an SMST gangway, a motion-compensated personnel transfer system designed for reliable and safe access to offshore wind installations. The gangway ensures efficient crew transfers across a wide range of sea states, keeping operations on schedule.
